Family business · over 15 years of experience

Complete delivery

Building a timber-frame house

From design review through the frame and insulation to the finish agreed with you — with one accountable contractor.

Installing sheathing on a timber house frame

Skan-Pol services

A healthy home on solid foundations

We specialise in energy-efficient timber-frame houses using natural materials from the STEICO system.

We treat every project individually. We assess the design, your expectations and the site conditions, then present a clear scope of work and estimate.

  • Foundation slab and site preparation
  • Frame made from certified C24 timber
  • Insulation, building elements, roof and facade
  • Windows, doors, services and finishing work within the agreed scope

Working together: the stages

You know what happens next

1

Consultation

We discuss your design, plot and expected standard.

2

Assessment

We check the documentation and select the construction systems.

3

Estimate

You receive a clearly defined scope and an indicative schedule.

4

Project

We manage construction with quality checks at every stage.

5

Handover

Together, we inspect the result and hand over the agreed work.

Technical solutions

Explore the structure layer by layer

The interactive sections show how the walls, floors, roof and foundation are built.

Open construction details

Preparing the 3D model…

Controls and 2D drawing

Details informed by photographs of one of our projects. This is an illustrative model; services are shown through the layers to make their routes clear.

The white loop shows underfloor heating in the floor screed, above the insulation and foil, not within the structural reinforced-concrete slab. Pipe spacing, thicknesses and routing are illustrative and must be specified for each project.

The services illustrate routing principles, not an installation design. Penetrations, seals and positions require individual design; the image does not indicate drilling locations in the structure.

Foundation slab

Layered section of a timber-frame house foundation slab

Select a number on the drawing to read the layer description.

Section 1 of 7

Foundation slab

Selected layer 1: Sub-base — medium sand mechanically compacted to Is = 0.97

Free quote

Have drawings? Let’s estimate your project

Start with the calculator or send your documentation — we will get back to you with clear information.